Construction of RRC Building. Construction of waste transfer facility including: Administration building, Workshop building and Weighbridge building.
Packages including: brickwork/blockwork, plastering and rendering, dry-lining, screeding, painting, tiling and floor coverings.
- Client: Shanks East London
- Administrator: Kier Construction Ltd